Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6260 Ahlstrom's Green Bay Line Is Up - Nonwovens Industry
Nonwovens News

Ahlstrom’s Green Bay Line Is Up

Ahlstrom has brought its new spunlace line, located in Green Bay, WI, online two weeks ahead of schedule. This additional capacity primarily serves the North American wipes market but  will also have the technological flexibility to meet the demands of other nonwovens markets.
 
Ahlstrom acquired the facility from Green Bay Nonwovens in 2004 and soon after announced plans to add a second line there. This  start-up follows the previous on time start-up of a spunlace composites line at Ahlstrom’s  Windsor Locks, CT,  facility. Ahlstrom is also adding a wipes production line in Louveira, Brazil.

Add us as a preferred source on Google

Get the latest Nonwovens Industry news, insights and analysis in your Google Search and AI experiences.

Keep Up With Our Content. Subscribe To Nonwovens Industry Newsletters